| Forum Holding Olympia Tower |
 |
| Business project |
 |
 |
Description |
 |
 |
Olympia Tower will be at the time of its completion the leading business center in Bucharest. The concept of the project is to add to Bucharest a unique landmark building. The project will be implemented on a land owned by Olympia Marble & Ceramica & Granite S.R.L.
The building has been designed in compliance with the Detail Urban Plan - D.U.P. having total building area of 15.000 sq. m. and 55 m height. The total occupation percentage POT is 52% and the coefficient of land occupation CUT is 6.8.
The available area will be 6.500 sq. m from which 1.000 sq. m will be commercial area.
The available area for offices space will be 5.500 sq.m. |
 |
Location |
 |
 |
The land has a surface of 1,575 square meters and is located at 25-29 Decebal Avenue, at the crossroads with Calarasilor Road and Mihai Bravu Avenue.
The building will be easy accesible from the city center and will be highly visible and immediately identifiable in Hurmuzachi Square (formerly known as Piata Muncii). This prestigious location will provide strong image and extensive business facilities to the companies that choose it. The building is in the vicinity of Piata Muncii subway station and of an important transportation crossroad. |
 |
Structure |
 |
 |
The building to be erected will have three underground floors, ground floor and 12 floors. (3S+P+12). The underground floors will accommodate a parking area for 100 cars and the heating plant, the transformer point and the water supplying plant. The surface of each underground will be 1500 s. q. m. The ground and first floor will be built as commercial area for retail spaces. The 11th floor will be designed as restaurant having a large terrace and a beautiful view of Lia Manoliu stadium and the park next to it.
The rest of 10 floors will be built as open space for A class office space. The customers will have the possibility of dividing the spaces according to their particular needs. The surface of each floor will be of 800 sq.m.
The building will be developed to international standards, employing the highest quality of finishing materials:
prestigious entrance hall
retail facilities on the ground and first floor
restaurant on the 11th floor
three internal elevators of 10 persons each and other two external elevators of 4 persons each
parking garage for 100 cars on levels |
 |
Utilities / Endowments |
 |
 |
The area is fully provided with required facilities for water and sewerage, power and gas supply and telephone system, in order to ensure the daily demand for the downtown area.
The building shall be equipped with:
water supply and sewerage installations
heating installations
lighting and power electrical installations
weak current installations (fire alarm, telephone, TV aerial, PC's)
air conditioning system
|
 |
 |
 |